Example project brief
Occupied office handover and defect closure
A tenant inherited an unresolved 94-item snag list and needed it closed without interrupting a working floor.

Illustrative content and photography—not a verified client case study.
The work package
What the scope covers.
- Snag verification and prioritised closure plan
- Electrical remedials, circuit labelling and DB tidy
- Lighting replacement and emergency-light testing
- Joinery, door and ironmongery rectification
- Painting and finishing in phased night works
Outcome & draft performance record
All 94 items were closed in eleven working days with zero working-hour disruption, each item photographed and signed off for the landlord's record.
- Snag items closed
- 94 of 94
- Working-hour disruption
- Nil reported
- Documentation
- Photo sign-off per item
- Handover
- Accepted first inspection
These example figures require client verification before use as public performance claims.
Property & mobilisation details
- Property (example)
- Commercial office, 820 m²
- Location (example)
- Business Bay, Dubai
- Duration (example)
- 11 working nights
- Trades
- Electrical remedials · Lighting · Joinery rectification · Painting