Skip to content

Penthouse joinery rectification and full repaint

Timber joinery had swollen and wardrobe doors no longer closed; wall finishes had cracked along ceiling junctions after seasonal humidity swings.

Illustrative owner-occupied penthouse environment

Illustrative content and photography—not a verified client case study.

What the scope covers.

  • Wardrobe door realignment and hinge upgrade
  • Replacement of water-damaged carcass bases
  • Crack assessment, stitching and priming
  • Full interior repaint in low-odour specification
  • Floor protection and nightly make-clean
Outcome & draft performance record

Completed in fourteen days in an occupied home, with all bedrooms handed over clean each evening and no content moved off site.

Rooms occupied throughout
6 of 6 usable each night
Joinery items rectified
21
Repaint area
340 m² of wall and ceiling
Content moved off site
None required

These example figures require client verification before use as public performance claims.

Property & mobilisation details
Property (example)
Owner-occupied penthouse
Location (example)
Downtown Dubai
Duration (example)
14 working days
Trades
Joinery · Crack repair · Painting · Make-clean

Every property starts with a closer look.

Tell us your requirement. We’ll help put the right scope together.