Villa cooling recovery before peak summer
Three of five AC zones were failing to hold set temperature and the owner was facing a sharply rising DEWA bill ahead of July.

Illustrative content and photography—not a verified client case study.
The work package
What the scope covers.
- Full system diagnosis across five zones
- Chemical coil cleaning on all indoor and condenser units
- Duct inspection, cleaning and sanitisation
- Two fan motors and one thermostat replaced
- Drain line re-pitching to stop recurring overflow
Outcome & draft performance record
Supply-air temperatures improved by an average of 4.6°C across the affected zones, recurring drain overflow stopped, and the villa moved onto a four-visit annual maintenance contract.
- Zones restored
- 3 of 5 underperforming
- Supply ΔT improvement
- +4.6°C average
- Repeat call-outs
- 0 in following 12 months
- Timeline
- Booked to completion in 9 days
These example figures require client verification before use as public performance claims.
Property & mobilisation details
- Property (example)
- Private villa, 5 bedrooms
- Location (example)
- Arabian Ranches, Dubai
- Duration (example)
- 9 working days
- Trades
- AC maintenance · Coil cleaning · Duct sanitisation · Electrical